Page 69 - Broken Arrow, OK Residential District Design Guidelines
P. 69
SITE
A Front Setback/Build to Zone (BTZ)
Area 6 0’ Min., 5’ Max.
1
Upper Floor Street Setback Required 2
Area 7 10’ Min, 75’ Max. 1
B Side Setback
Area 6 0’ Min, 5’ Max. exterior side setback
Area 7 10’ Min.
C Rear Setback
Area 6 & 7 10’ Min. 4
D Building Alignment
Area 6 & 7 Required 5&6
E Space Between Buildings
Area 6 & 7 0’ Min, 10’ Max.
F Parking Location
30’ Min. setback from front property line,
Area 6
10’ Min. setback from residential 7
1 double row Max. between street-facing
wall and street
Area 7
10’ Min. setback from front property line,
10’ Min. setback from residential
G Parking Access
Area 6 Max. 1 access point per block from Main
Street and Broadway Avenue
8
Area 7 Limit access from perimeter corridors 9
H Access and Driveway Width
Area 6 20’ Max.
Area 7 24’ Max
Additional Information
Note: Sidewalks shall be provided along all street frontages in 4 Building Alignment
accordance with the Subdivision Regulations. Interior Lot: Front wall of primary structure shall be parallel to street
1 Maximum building setback may be increased up to 30’ if a Corner lot: Both street-facing walls of primary structure shall be parallel to each
plaza, outdoor seating or other publicly-accessible amenity is street
provided within the setback.
5 Exception for corner accent or entry features
2 For buildings above 3 stories, the 4th story and above must
be set back 15’ from the property line 6 No parking forward of street-facing wall
3 If an alley is present, rear setback is 2’ min. 7 Must access parking from alley or side street
8 Where feasible, access parking from side street
Broken Arrow Downtown Residential Overlay District (DROD) Design Standards 65