Page 64 - Michigan City, IN US Highway 421 Corridor Plan
P. 64

3.4 Redevelopment Case Studies: Belmar Redevelopment Project, Lakewood, Colorado





              Overview: Mall in Decline




              The Villa Italia mall in Lakewood started to decline in the 1990s,   Old Mall — Villa Italia                 Redeveloped Mall — Belmar
              and in 1997 city voters authorized the use of urban renewal
              powers. The new center was named Belmar after the former           Location — Lakewood, Colorado                Mall Redevelopment  — Mixed-Use Town Center or Urban District  Transit — Three local and two express bus lines across the



              estate on which it sits and was designed to give Lakewood                                                                  Model                                                street

              a downtown. The entire site was rezoned to launch a phase     City Population — 144,000                                                                                      —   Within five miles of the new Alameda light rail

              development process in which the purposed of the blocks could   5-mile Catchment Area                                 Year opened — 2003                                        station and two miles from the Wadsworth

              be determined over time. The project is the product of a public/      Pop.                                                  Scale — 103 acres                                   station on  the West Corridor light rail line
              private partnership between the city of Lakewood and the          Year Built — 1966                                         Retail — 880,000 sf                        Access — One mile from US Route 6 and four miles from



              developer Continuum Partners. The developers designed Belmar          Size — 1.4 million sf                                      —   Mix of national chains and local           I-25

              to be a walkable place, it is based on a grid street system of                                                                     businesses


              22 streets (owned by the city) that feature wide sidewalks and   Occupancy Rate at time  — 30%                                   —   Movie Theater                     Parking — Three 1,000 space public garages
              narrow roads.  1                                           of Redevelopment                                                      —   Bowling Alley                           —   2,000 street and surface parking spaces

                                                                      Proximity to City Center — Lakewood is an inner suburb 15                                                    Neighbors — North (Alameda Avenue) and West (Wadsworth


              The Belmar project was roughly $850 million financed with a                  minutes from Downtown Denver                   Office — 250,000 sf                                 Boulevard) are commercial corridors with

              combination of government bonds, federal grants, and equity                                                            Residential — 800 rental and for-sale units              Lakewood Commons shopping center across the

              from Continuum. To date, $160 million has been spent on                                                                Civic Space — Two education institutions                 street (west) from Belmar
              infrastructure improvements, $40 million of which was financed                                                                   —   Central plaza and parks, total nine acres    South and east of Belmar are single family
              by developer equity. (The garages alone cost $35 million, or                                                               Events — Farmers market,                          —  residential neighborhoods.

              about $14,000 per space.) The bonds for the project are backed                                                                   —   Holiday happenings
              primarily by a property tax increment pledge and the imposition                                                                  —   Annual Italian Festival
              of a 2.5 percent public improvement fee by the developer on
              retail sales. To offset the public improvement fee, the city has
              waived two percent of the three percent sales tax on the site.
              Using revenues from the public improvement fee and property
              tax increment, Continuum will be reimbursed for the public
              infrastructure by 2028, reported Larry Dorr, director of finance
              for the city of Lakewood.  2
              The Urban Land Institute (ULI) used Belmar as a case study
              for redeveloping suburbs and drew the following ‘lessons
              learned,’ First, the urban-scale street grid is a classic choice.
              Second, innovative financing arrangements can enable a private
              landowner to build infrastructure, with public reimbursements
              to follow. And finally, the competitive advantage that compact,
              mixed-use development can have is demonstrated by Belmar.  3

              1  February 19, 2013. “Belmar in Lakewood, Colorado, Provides Year-Round
              Activities”. Urban Land Institute (http://uli.org/infrastructure-initiative/bel-
              mar-in-lakewood-colorado-provides-year-round-activities/)
              2  2012. “Shifting Suburbs Reinventing Infrastructure for Compact Develop-
              ment”. Urban Land Institute (http://uli.org/wp-content/uploads/ULI-Docu-
              ments/Shifting-Suburbs.pdf)
              3  2012. “Shifting Suburbs Reinventing Infrastructure for Compact Develop-
              ment”. Urban Land Institute (http://uli.org/wp-content/uploads/ULI-Docu-
              ments/Shifting-Suburbs.pdf)
                                                                     Source: “Belmar”. Better Cities & Towns, http://bettercities.net/places/placesnewur-  Source: “Plan: Belmar”. Van Meter Williams Pollack LLP.   Source: “The Death and Life of American Shopping Malls”. Closed Loop closedloop.us
                                                                                                         bandevelopment/belmar
               3-14

              3.0  Envision 421 Gateway District          Adopted: August 16, 2016
   59   60   61   62   63   64   65   66   67   68   69