Page 57 - Broken Arrow, OK Residential District Design Guidelines
P. 57
SITE*
A Front Setback/Build to Zone (BTZ)
Area 1 10’ Min./90% BTZ 1
Area 5 5’ Min./90% BTZ 1
Area 6 0’ Min; 5’ Max. 2
B Side Setback
Area 1, 5 & 6 0’ Min., End Unit: 5’ Min.
C Rear Setback
Area 1, 5 & 6 10’ Min. 4
D Space Between Buildings
Area 1, 5 & 6 10’ Min.
E Garage and Carport Location
Area 1 15’ Min. setback 5&6
Area 5 20’ Min. setback 5&6
Area 6 30’ Min. setback 5&6
F Access and Driveway Width
Area 1, 5 & 6 20’ Max. 7
G Building Alignment
Area 1, 5 & 6 Required 8
Additional Information
Note: Sidewalks shall be provided along all street frontages in 5 No garage door can be visible from the street
accordance with the Subdivision Regulations.
6 If an alley is present, access to a garage, carport or open parking
* Where a site will be subdivided into more than one parcel, must be from the alley.
lot and site design standards should be based on the
collective area of all parcels. 7 Building Alignment
Interior Lot: Front wall of primary structure shall be parallel to
1 90% of front wall is required to be placed within 5’ of street
required front setback.
Corner lot: Both street-facing walls of primary structure shall be
2 Exception for permanently hardscaped public plaza, parallel to each street
outdoor seating, etc. that is within 5’ of the maximum front
setback
3 If an alley is present, rear setback is 2’ min.
4 No parking is allowed between street-facing wall and street
Broken Arrow Downtown Residential Overlay District (DROD) Design Standards 53