Page 83 - Michigan City, IN US Highway 421 Corridor Plan
P. 83
4.4 Landscape Enhancements
Big R Driveway
Greenfield Redevelopment Area B: Dunes Plaza Entry
Dunes Plaza-South
C C
65’ Roadway
13’ Travel 11’ Travel 16’ Center 13’ Travel 12’ Travel
Lane Lane Lane Lane Lane 421
65’ Roadway
13’ Travel 11’ Travel 16’ Center 13’ Travel 12’ Travel
Lane Lane Lane Lane Lane
EXISTING CONDITIONS
EXISTING CONDITIONS
Streetscape Elements
Streetscape Elements A Reduced Roadway Width 56’ Roadway
56’ Roadway
A Reduced Roadway Width B Decorative Roadway Light 11’ Travel 11’ Travel 12’ Center 11’ Travel 11’ Travel
Lane
Lane
Lane
Lane
Lane
C
Sidewalk
B Decorative Roadway Light D Buer Landscape Planting 11’ Travel 11’ Travel 12’ Center 11’ Travel 11’ Travel
C Sidewalk E Buering Trees Lane Lane Lane Lane Lane
D Buer Landscape Planting E
E Buering Trees B
E
Existing Conditions: US Highway 421 at between US Highway 20 B
and CR N 400 W A C D
PROPOSED STREET ENHANCEMENTS
Section C: Dunes Plaza - South Streetscape Character
A D South Commercial Enhancements
C
As illustrated in Section C, Dunes Plaza-South Streetscape
Character, retail establishments within the area exhibit a more
PROPOSED STREET ENHANCEMENTS
Existing Conditions: US Highway 421 at between US Highway 20 Section B: Proposed US Highway 421 between US Highway 20 and CR N 400 W ‘urban’ streetscape character, and have widened sidewalks to
encourage outdoor seating, dining and people-watching. Some
and CR N 400 W South Commercial Enhancements
buildings face the street while others benefit from fronting on
to parts of the linear park. Decorative banners mounted on
ornamental street lights enliven the spaces. 4-09
Adopted: August 16, 2016 Redevelopment Scenarios 4.0