Page 84 - Michigan City, IN US Highway 421 Corridor Plan
P. 84

4.4 Landscape Enhancements






                     20                                                                   Marquetter Mall Entry                        St. John Road






















       421








                                                                 South Gateway Option:
                                                                 S. Franklin Street Pedestian Overpass


                     20






















              Gateway Entrance Feature at the NE Quadrant of US Highway 421   Gateway Entrance Feature at the intersection of US Highway 421   S. Franklin Street Pedestrian Overpass
              and Highway 20                                        and CR W 400 N
              Gateway Entrance Features On US Highway 421, the two   art installations be commissioned and administered by the   South Gateway Option In addition to the proposed gateway wall   the 421/20 northeast quadrant redevelopment area, but also
              primary southern entrance points into Michigan City that   Michigan City Mainstreet Association. The theme of these art   signs and other free-standing, sculptural installations at key   function as a significant southern gateway for the City.
              can function as primary and secondary gateways include,   installations would be inspired by the Lake Michigan shoreline   interchanges, a pedestrian overpass spanning S. Franklin Street
              the intersection at CR W 400 N, and the intersection at US   landscape and artistic treatments developed as part of the Lake   in proximity to Kintzele Road would not only provide a safe
              Highway 20. In addition to the wave walls and landscape   Michigan Gateway Implementation Strategy as well as those   recreational trail connection between the Marquette Mall and
              treatment, it is recommended that large, freestanding sculptural   featured in the Downtown Arts District.
              4-10


              4.0  Redevelopment Scenarios          Adopted: August 16, 2016
   79   80   81   82   83   84   85   86   87   88   89