Page 85 - Michigan City, IN US Highway 421 Corridor Plan
P. 85
4.4 Landscape Enhancements Southwood Drive Chestnut Street Brinkman Avenue Coolspring Avenue
Barker Road
D
421
65’ Roadway
12’ Travel 11’ Travel 16’ Center 13’ Travel 13’ Travel
Lane Lane Lane Lane Lane
D
65’ Roadway
12’ Travel 11’ Travel 16’ Center 13’ Travel 13’ Travel
Lane Lane Lane Lane Lane
EXISTING CONDITIONS
Streetscape Elements
A Reduced Roadway Width
B Decorative Roadway Light 56’ Roadway
C Sidewalk 11’ Travel 11’ Travel EXISTING CONDITIONS
12’ Center
11’ Travel
11’ Travel
D Buer Landscape Planting Lane Lane Lane Lane Lane
Streetscape Elements
E Buering Trees
A Reduced Roadway Width
B Decorative Roadway Light 56’ Roadway
C Sidewalk 11’ Travel 11’ Travel 12’ Center 11’ Travel 11’ Travel
D Buer Landscape Planting Lane Lane Lane Lane Lane E
E Buering Trees B
Existing Conditions: US Highway 421 at S. Franklin Street
E
D B A
C
PROPOSED STREET ENHANCEMENTS
D A
C North Commercial / Residential Enhancements
PROPOSED STREET ENHANCEMENTS
Section D: Proposed Improvements to S. Franklin Street
North Commercial / Residential Enhancements
Existing Conditions: US Highway 421 at S. Franklin Street
4-11
Adopted: August 16, 2016 Redevelopment Scenarios 4.0